News Review
Southern Drive/Enzi Drive intersection out of service
and additional information from the City of Gillette's Engineering Division
Posted Date: 12/6/2012 9:45 PM

The City of Gillette's Engineering Division announced late today that the traffic signal at the Southern Drive/Enzi Drive intersection will be out of service until the afternoon of Monday, December 10th (approximately.)

The traffic signal control wires at the Southern Drive/Enzi Drive intersection were damaged during construction activities for the Madison pipeline project earlier today.  Temporary stop signs will be placed at the three-way intersection until the repairs to the control wires are complete.  The Engineering Division anticipates that the traffic signal will be repaired by the end of the day on Monday, December 10th.  Drivers are asked to drive with caution in the area.

Highway 50/West 2nd Street project update
With winter approaching the City of Gillette would like to give an update on the progress of the Gillette Streetscape – Highway 50 and West 2nd Street project.  The irrigation work is nearing completion, and the project will be closing down until spring weather arrives.
This is when the planting will take place providing the best quality of plants and providing the best chance for survival.

Citizens might notice that spray mulch is being sprayed over the area which has not been prepared for the final installation. 

Please note: this mulch is to keep the dust down and to maintain moisture in the ground. The mulch does not have seed in it, as the planting work will disturbed the area when performed.

Questions on this Highway 50/West 2nd Street project should be forwarded to the City of Gillette Engineering Division (307) 686-5265.